New Products
Find C Channel Steel Roll Forming Machine For Roof, C Shape Channel Making Machine, C Shape Steel Beam Roll Forming Machine on Industry Directory, Reliable Manufacturer/Supplier/Factory from China.
Min. Order: | 1 Set/Sets |
---|
No. | Device Name | Specification | Note |
1 | Main Under Frame | 400 H-beam | Flatness:±0.2mm |
2 | Sidewall Structure | 20mm A3 Steel Plate | |
3 | Feeding Unit | Guide Shaft & Guide Roller | |
4 | Flatting Unit | 7 rolls (up 3 down 4) with 1 step lead | |
5 | Straighting Unit | 2 rolls for 4 side | |
6 | Forming Rollers | GCr15 | vacuum heat treatmentafter CNC lathe upto HRC58~60℃, tolerance +0.05 mm 0.08mm |
7 | Shaft | 45# 80mm | Forging treatmentafter CNC lathe uptoHRC28~32℃, tolerance -0.02~0.05mm |
8 | Punching after forming | Single Hole φ14 DoubleHole14*20mm | Punching die: Cr12 |
9 | Cutting after forming | Stop to post and post to cut,raw material is Cr12Mov |
In correct operation & maintaining, the machine is guaranteed for 18 months since leaving our
factory excludes the electric elements.
Installation:If installation is needed, we will dispatch a technician to the buyer’s factory abroad to assist
regulating the machine with charge. The buyer should assist the technician to get the Chinese technician's
visa and should pay for the roundtrip air ticket and the local accommodation.If installation is needed, the
buyer shall make the following preparation before arrival of technicians.
* Position the machine in the buyer’s factory.
* Prepare necessary electric wiring.
* Prepare material of trial running.
* Provide labors for assistance and installation during instalation.
Q1. What's your delivery time?
A1: Depending on the type of machine, duration of 15 days to 60 days from the date of contract.
Q2. Do you have after-sales support?
A2: Yes, we are happy to give advice and we also have skilled technicians available across the world. We need your machines running in order to keep your business running.
Q3. Do you sell only standard machines?
A3: No, most of our machines are built according to customers specifications, using top brand components.
Q4. What will you do if the machine is broken?
A4: Our machine's warranty period is 12 months, if the broken parts can't repair, we can send the new parts replace the broken parts freely, but you need pay the express cost yourself. If it is beyond the warranty period, we can negotiate to solve the problem, and we supply the technical support for the whole life of the equipment.
Q5. Can you be responsible for transport?
A5: Yes, please tell me the destination port or address. we have rich experience in transporting.
Q6. How to visit your company?
A6: 1) Fly to Beijing airport, By high speed train From Beijing Nan to Cangzhou Xi (1 hour).
2) Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Cangzhou Xi(4.5 hours), then we can pick up you.
Product Categories : C-Z Purline Roll Forming Machine